Indicators of Services Performed

  • 4,500 km of highways design;
  • 2,500 km supervised highways;
  • 300 km projected and executed urban highways;
  • 80 projects and supervisions of Special Works of Art (Bridges and Viaducts);
  • 45 Supervisions of Road Works;
  • 25 transport system design / supervision;
  • 350,000 area of direct influence of EIA / RIMA;
  • 500,000 ha of environmental zoning;
  • 2,000 km of environmental liability recovery along the highways;
  • 1,500,000 ha of Environmental Control Plans;
  • 200 Executive design of Water Treatment Stations;
  • 70 Design of Sewage Treatment Plants;
  • 220 Design of Water and Sewage Stations;
  • 2,500 km of projected water distribution networks;
  • 3,000 km of designed sewage collection networks;
  • 4,000 km of designed sewage collection networks;
  • 50,000 m² of Industrial Building Implantation Control;
  • 23 projects and supervision of industrial districts;
  • 75,000 m² designed in Industrial Buildings;
  • 55,000 m² of management and supervision of industrial works executed;
  • Over 3 million m² in executive projects designed for industrial infrastructure works;
  • Over 2.8 million m² in management and supervision of industrial infrastructure works carried out;
  • More than 500,000 ha, comprising 12 hydro-irrigation projects, including pre-projects for irrigation works, agricultural planning and financial analysis;
  • 200 thousand ha, comprising 25 irrigated perimeters, execution of basic and executive projects, including more than a thousand channels, pumping stations and related works;
  • Supervision of Irrigation Works for 20 irrigated perimeters; Engineering projects and supervision of works of 29 dams for irrigation and public supply;
  • Execution of management plans for water resources in 18 river basins;
  • Pre-operation and operation of more than 30 infrastructure projects.